Ocean Terminal Totem

Name: Totem
Location: Ocean Terminal Edinburgh
Duration: 4 weeks
Scope: Installation of Totem Support System

 
Ocean Terminal TotemOcean Terminal Totem

Ocean Terminal Totem

In 2006 Geckotech Solutions were called in to install the ‘Totem’ structure in Ocean Terminal Shopping Centre Edinburgh. Scaffolding and cherry pickers could not be used so rope access and rigging techniques were implemented to provide the access solution. The Totem was the first of its kind, providing children and adults a like, an adventure within the confines of the shopping centre. Customers would climb, jump and swing their way to the top!

Firstly technicians removed lighting units and awnings from the roof area to create a space in which the support steelwork could be introduced .

Once cleared technicians introduced three large ‘I’ beams to the existing steelwork creating the support structure for the Totem. The complicated nature of the building along with the length of the ‘I’ beams required us to use five chain blocks to manoeuvre each beam into

position! Also during this phase technicians installed steel cables for the ‘belay’ system to support customers if they were to fall off.


The Totem in all her glory! The final piece of the jigsaw required five chain blocks to raise the Totem to her anchor points 18 meters in the air. The Totem was a great success both for Geckotech and the client with many thousand customers donning their harnesses and attempting the impossible climb to the top!

Back to Projects

Recent Projects

Name: Forth Rail Bridge
Location: S Queensferry
Duration: 3 Years
Scope: Provision of Industrial Rope Access Services Bridge Wide

Continued >>

Location: UK Wide
Duration: 5 Years
Scope: Provision of Access Support and Examination Services

Continued >>

Name: Arnish Point Re-cladding
Location: Stornoway, Lewis
Duration: 6 Months
Scope: Installation of Tension Netting and Vertical Weather Protection

Continued >>

Name: Kingsmead Leisure Centre
Location: Canterbury
Duration: 4 weeks
Scope: Maintenance & Repair of Glazed Curtain Walling.

Continued >>

Name: Totem
Location: Ocean Terminal Edinburgh
Duration: 4 weeks
Scope: Installation of Totem Support System

 

Continued >>

Name: Tay Bridge Inspection Project
Location: Tay Rail Bridge
Duration: 6 months
Scope: Rescue Cover, Tension Netting Systems and Access Consultancy

Continued >>

Name: Marks Hotel Re-Coating Works

Location: Bath Street, Glasgow

Duration: 4 weeks

Scope: Re-coating/ sealing of exisitng rough cast render

Continued >>

Are you looking for something?