0131 552 7073

Our Services

Tension Netting Systems

Geckotech Solutions have been deploying tension netting or walk on netting systems across the UK for 5 years  with some 30,000 SQM of tension netting installed to date.  Tension netting systems offer a safe, cost  effective alternative to suspended scaffolding and other traditional access systems designed to provide access to under deck areas of structures such as bridges, pier, jetties and offshore platforms.

This innovative system can be installed to provide work positioning, fall prevention, dropped object protection and total debris containment. Geckotech can provide full containment for blasting, & painting activities with the ability to control the environment within the encapsulation to the required specification.

Gecko Encapsulation System


The Gecko Encapsulation System is an innovative containment system which when used in conjunction with Tension Netting or Decking Systems provides the worker with a comfortable and controllable working atmosphere for grit blasting and coating work scope whilst the environment and surrounding area remain unaffected by waste or bi-products.
 

The correct application of the Gecko Encapsulation System can benefit our clients in the following ways:
 

  • Containment of air borne particles such as over spray and blast media
  • Positive and Negative pressures are achievable
  • Reduction in clean up and waste management costs
  • Environmental protection


All the benefits of Tension Netting and Decking Systems
 

The introduction of effective humidity control for coating applications. Geckotech technicians can achieve a relative humidity of 40% and below. This can be maintained retarding the corrosion process.

The encapsulation system is made from high quality materials easily capable of with standing the daily abuse from prevailing weather conditions and any of the following tasks:
 

  • Grit Blasting and Spraying
  • Hot works
  • Minor Construction Works
  • Work scope requiring particular atmospheric conditions and full containment properties

Recent Projects

Name: Marks Hotel Re-Coating Works

Location: Bath Street, Glasgow

Duration: 4 weeks

Scope: Re-coating/ sealing of exisitng rough cast render

Continued >>

Name: Tay Bridge Inspection Project
Location: Tay Rail Bridge
Duration: 6 months
Scope: Rescue Cover, Tension Netting Systems and Access Consultancy

Continued >>

Name: Totem
Location: Ocean Terminal Edinburgh
Duration: 4 weeks
Scope: Installation of Totem Support System

 

Continued >>

Name: Kingsmead Leisure Centre
Location: Canterbury
Duration: 4 weeks
Scope: Maintenance & Repair of Glazed Curtain Walling.

Continued >>

Name: Arnish Point Re-cladding
Location: Stornoway, Lewis
Duration: 6 Months
Scope: Installation of Tension Netting and Vertical Weather Protection

Continued >>

Location: UK Wide
Duration: 5 Years
Scope: Provision of Access Support and Examination Services

Continued >>

Name: Forth Rail Bridge
Location: S Queensferry
Duration: 3 Years
Scope: Provision of Industrial Rope Access Services Bridge Wide

Continued >>

Are you looking for something?